A good smoke test covers the critical path only, runs in under five minutes, and fails loudly with a clear message.
Designing a smoke suite
Pick the critical path
The routes, jobs or queries whose failure makes the product unusable.
Keep it fast
If the smoke suite takes longer than a coffee break, it will be skipped.
Fail loudly
A smoke failure must block the pipeline, not warn and continue.
Do not duplicate
Smoke tests gate; unit and integration tests verify. Do not turn smoke into a second integration suite.