Always read the plan, diff against expectations, run against the real target when possible, and treat every dry run as a small test suite for the change itself.
A dry run that actually catches mistakes
Read the plan, do not skim
A plan with three changes is easy to review. A plan with three thousand changes needs a second opinion.
Compare against expectations
If you expected one file deleted and the plan says fifteen, stop.
Dry-run against production
Staging has different data. A dry run against the real target catches the surprises that staging hides.
Log the dry run
Save the plan output. It becomes the contract for what the real run should produce.