Skip to content

How to use one well

Always read the plan, diff against expectations, run against the real target when possible, and treat every dry run as a small test suite for the change itself.

A dry run that actually catches mistakes

  1. Read the plan, do not skim

    A plan with three changes is easy to review. A plan with three thousand changes needs a second opinion.

  2. Compare against expectations

    If you expected one file deleted and the plan says fifteen, stop.

  3. Dry-run against production

    Staging has different data. A dry run against the real target catches the surprises that staging hides.

  4. Log the dry run

    Save the plan output. It becomes the contract for what the real run should produce.